Risk Assessments & Method Statements
Write site-specific RAMS for the job in front of you
Stop copying generic templates that don't match the site. Describe the task in plain English on your phone and Site Genie drafts structured UK RAMS — complete with fixed risk scoring, controls, PPE, COSHH and sequence of works — ready for you to check, edit and approve.
Plasterboard partition, first floor
RAMS-03Working at height from a stepladder
2 × 4 = 8 MediumPlatform steps with handrail; three points of contact
Dust from cutting plasterboard
3 × 2 = 6 MediumScore and snap; FFP3 mask if power-cutting
Example risk assessment · checked and approved by you
Drafted for your actual task, never finalised without you
Principal contractors and site managers spot copy-paste RAMS immediately. Site Genie writes your scope, step-by-step method statement, hazards and control measures around the actual task, plant, materials and site constraints you give it.
Every hazard is scored with fixed likelihood × severity maths before and after controls, and every RAMS document stays marked as a draft until you review, edit and approve it.
Task-specific method statements
Clear scope, sequence of works, plant and equipment checks, permits required and operative competence.
Fixed likelihood × severity scoring
Initial and residual risk ratings are worked out consistently by fixed calculation rather than guessed.
COSHH, PPE & emergency details
Covers hazardous substances, required PPE, first-aid arrangements, welfare and site emergency procedures.
Revision history & PDF export
Edit in the browser, keep numbered revisions as site conditions change, and export clean PDFs once you approve them.
Step by step
From site walk to approved PDF
- 01
Describe the job & site
Tell Site Genie what work is being carried out, where on site, what plant or substances are involved, and any live constraints.
- 02
Review & edit the draft
Check every hazard, control measure, sequence step and emergency detail, and adjust anything to match how your team actually works.
- 03
Approve & export PDF
Nothing is final until you approve it. Once approved, download or send the numbered RAMS PDF.
Questions
Good to know
Are RAMS automatically issued without me checking them?
Never. Every RAMS document starts as a draft so you can inspect, edit and confirm every hazard, control and sequence step before approving it.
How are hazard risk scores worked out?
Site Genie uses a fixed likelihood × severity risk calculator to score hazards before and after control measures, keeping ratings consistent across revisions.
Can I update RAMS if the job changes on site?
Yes. You can revise an existing RAMS from your phone, automatically superseding older versions while keeping a clear numbered history.
Try Site Genie on your next plot
200 free credits when you sign up, every feature included, no card needed, and nothing to install from an app store.